The work to build a 3 cubicle toilet block at Kunduma School is progressing and we now have adequate funds in place to include rainwater harvesting and a handwash station. The facilities may look very basic but to all the 100+ children at the School they will “Make A Real Difference”.
If all goes well the block will be ready for use at the start of 2020 – with a bit of luck before Christmas.



